EU GMP Annex 15: Qualification and Validation

In force Quality foundations · Annex Last verified: not yet · Source last checked 3 Nov 2026

Issued by
European Commission
Category
Quality foundations
Sub Category
Annex
Legal weight
GMP guide & annexes
Reuse
CC BY 4.0

The EU's GMP rules on qualifying equipment and validating manufacturing processes.

How to read this page

Details: Guide Definitions: every term and label explained

Lifecycle

Solid steps have happened. A dashed step is expected, and it is not a fact. Only dated steps in our record appear here.

  1. Done · 1 Oct 2015Came into operation

In plain English

The EU GMP annex on qualification and validation.

Summary drafted with AI assistance. Not yet reviewed by the SME Reviewer. Read the official text before acting.

Context and history

Annex 15 sets out the EU's principles for qualifying and validating facilities, equipment, utilities and processes. It was first published in 2001, and this revision came into operation on 1 October 2015 to reflect changes in manufacturing and regulation, including ICH Q8 to Q11, Annex 11 and newer process validation thinking.

It is not a computerised systems document, but it is linked: computerised systems often control the equipment and processes it covers, and the FDA and PIC/S have comparable expectations. PIC/S PI 006-4 is a related document, and a concept paper on revising Annex 15 is listed by PIC/S.

Who and what it applies to

Facilities, equipment, utilities and processes used to make medicinal products. It may also be used as optional supplementary guidance for active substances.

What it contains

Principle
Sets the scope, and links qualification and validation to the product lifecycle and risk.
1. Organising and planning
Validation master plan or equivalent, and a risk management approach.
2. Documentation
Good documentation, protocols, reports and handling of changes.
3. Qualification stages
User requirements, design qualification, factory and site acceptance tests, installation, operational and performance qualification.
4. Re-qualification
Periodic evaluation to confirm a state of control.
5. Process validation
Traditional, continuous and hybrid approaches, and continued process verification.
6. Verification of transportation
Transport conditions and their monitoring.
7. Validation of packaging
Primary packaging equipment.
8. Qualification of utilities
Steam, water, air and other utilities.
9. Validation of test methods
Analytical test methods.
10. Cleaning validation
Demonstrating effective cleaning.
11. Change control
Control of planned changes.

Key points

  • Validation is a lifecycle activity tied to risk.
  • Qualification follows stages from user requirements to performance qualification.
  • Requalification is periodic.
  • Process validation has more than one accepted approach.
  • Change control applies throughout.

In practice

General reading, not advice. This is drafted with AI and may not fit your situation. It does not replace the official text, your own quality system or qualified advice, and an inspector may take a different view.

  • Align validation for equipment and its controlling software, so the two do not leave gaps between them.
  • Use the same risk approach across Annex 15 and Annex 11.

Read from the source document on 1 Nov 2026. This is our own description, not the official text. Check the full dated history in the change log below.

Change log

Key dated events only, not a complete history. Status after is the status once that event happened. Event kinds explained

DateEventStatus afterSource
1 Oct 2015Came into operationIn forceSource for Came into operation

How other documents connect to this one. Links explained

Compare with all linked instruments

Official source

The official text always prevails over anything on this site.

Read the official text

Source: European Commission. Licensed under CC BY 4.0.

Stay updated

Newsletter signup opens at launch.