European Commission · Life Science & Pharma: GxP - CSV & Data Integrity
EU GMP Annex 11 revision: Computerised Systems (draft)
Draft CSV & Data Integrity · Annex Last verified: not yet · Source last checked 3 Nov 2026
- Issued by
- European Commission
- Category
- CSV & Data Integrity
- Sub Category
- Annex
- Legal weight
- GMP guide & annexes
- Reuse
- CC BY 4.0
A proposed rewrite of Annex 11, covering modern topics like cloud services and cybersecurity. It is a draft and does not apply yet.
How to read this page
- The line under the title explains in plain words what this item is for. The coloured label beside its status gives its Category, its main subject, and Sub Category, the type of document, in the same colours as the maps.
- Status comes from the latest dated event below, and each event links to its source.
- Lifecycle shows the steps so far, then any expected target. Targets are not facts.
- In plain English is our own summary, not the official text. Where we have read the document in detail, a fuller profile follows, with its context, scope, contents and key points.
- Related shows links to other documents. Select Compare to see two side by side.
Lifecycle
Solid steps have happened. A dashed step is expected, and it is not a fact. Only dated steps in our record appear here.
- Concept paper on revising Annex 11 (EMA/INS/GMP/778340/2022)
- Draft published for public consultation
- Public consultation closed
- Target: final text to European Commission (Q4 2026, slipped from Q1 2026)
In plain English
A full rewrite of Annex 11, published for consultation with the revised Chapter 4 and the new Annex 22. It expands expectations on supplier oversight, data integrity, audit trails, identity and access, cloud and outsourced services. Not yet in force: the 2011 Annex 11 still applies.
Summary drafted with AI assistance. Not yet reviewed by the SME Reviewer. Read the official text before acting.
Context and history
This is a full rewrite of Annex 11, not a light update. A concept paper appeared in November 2022, and the draft was published for public consultation on 7 July 2025, closing on 7 October 2025. It was prepared jointly by the EU GMP/GDP Inspectors Working Group and the PIC/S Committee, so the intention is one common approach across EU and PIC/S authorities.
The stated reasons are changes in regulatory and manufacturing environments, growing use of cloud services, new technologies, and the need to remove ambiguity and inconsistency. It grows from about five pages to about nineteen and is far more prescriptive, particularly on identity and access, audit trails, security and cloud-based services.
It was published with the revised Chapter 4 and the new Annex 22 on AI, and the three are designed to work together. It is still a draft: nothing in it applies yet, the text may change, and the 2011 Annex 11 remains in force.
Who and what it applies to
All types of computerised systems used in manufacturing medicinal products and active substances. The draft speaks to regulated users, and it extends to suppliers and service providers through oversight and contracts.
Alternative practices may be used if they are proven and documented to give the same or a higher level of control.
Not covered: Anything beyond computerised systems used in manufacturing medicinal products and active substances. AI models are dealt with in draft Annex 22.
What it contains
- 1. Scope
- All computerised systems used in manufacturing medicinal products and active substances.
- 2. Principles
- Lifecycle management, quality risk management, alternative practices, data integrity under ALCOA+, system requirements, outsourced activities, security, and no increase in risk.
- 3. Pharmaceutical quality system
- Places system management inside the pharmaceutical quality system.
- 4. Risk management
- Risk management across the lifecycle: identification and analysis, appropriate validation, mitigation, and data integrity.
- 5. Personnel and training
- Cooperation between roles, and training.
- 6. System requirements
- GMP functionality, extent and detail, ownership, keeping requirements updated, traceability, and configuration.
- 7. Supplier and service management
- Regulated user responsibility, audit, oversight, documentation availability and contracts.
- 8. Alarms
- A new section: reliance on alarms, settings, signalling, acknowledgement, logs, searchability and review.
- 9. Qualification and validation
- Principles, risk management, installation and configuration, evidence, traceability, focus, planning and approval, completion before use, and authorisation.
- 10. Handling of data
- Input verification, transfer, migration and encryption.
- 11. Identity and access management
- Unique accounts, continuous management, certain identification, confidential and secure passwords, strong authentication, auto locking, inactivity logout, access logs, guiding principles and recurrent reviews.
- 12. Audit trails
- Manual user interactions, recording who, what, when and why, no editing or deactivation, review support, independent review, scope and timeliness, electronic copies, and availability to the Qualified Person.
- 13. Electronic signatures
- Scope, open systems, re-authentication, date and time, meaning, manifestation, indisputability, an unbreakable link, and hybrid solutions.
- 14. Periodic review
- Periodic reviews, their scope and frequency.
- 15. Security
- The longest section: security system, improvement, training and tests, physical access, disasters, replication, disaster recovery, segmentation and firewalls, platforms and patching, scans, ports, anti-virus, penetration testing and encryption.
- 16. Backup
- Regular backup, frequency and retention, physical and logical separation, scope, and restore tests.
- 17. Archiving
- Read-only archives, verification, backup, durability and retrieval.
- Glossary
- Defined terms.
Key points
- The draft moves from principles to detailed expectations, with far more prescribed controls.
- Security becomes a major topic, covering firewalls, patching, penetration testing, disaster recovery and encryption.
- Audit trails are expected to capture who, what, when and why, and cannot be edited or deactivated.
- Alarms get their own section for the first time.
- Identity and access management is spelled out, including unique accounts and strong authentication.
- Periodic review stays, and backup and archiving are separated more clearly.
- ALCOA+ is named as the data integrity framework.
- It must be read with the revised Chapter 4 and new Annex 22.
- Nothing here applies yet. Only the final text will, once published and in operation.
In practice
General reading, not advice. This is drafted with AI and may not fit your situation. It does not replace the official text, your own quality system or qualified advice, and an inspector may take a different view.
- Use a gap review against the draft to plan budgets for systems due for replacement, knowing the final text may differ.
- Security is likely to be the biggest change for many sites, and IT and OT security teams may need to be involved earlier than QA is used to.
- Review legacy systems that cannot deliver unique accounts or locked audit trails, as these may be hardest to bring into line.
- Check supplier contracts and cloud agreements, because the draft expects more oversight and evidence.
- Do not change validated systems purely for a draft. Wait for the final text before formal commitments.
Read from the source document on 1 Nov 2026. This is our own description, not the official text. Check the full dated history in the change log below.
Change log
Key dated events only, not a complete history. Status after is the status once that event happened. Event kinds explained
| Date | Event | Status after | Source |
|---|---|---|---|
| Target 31 Dec 2026 | Target: final text to European Commission (Q4 2026, slipped from Q1 2026) | Expected: Final text to EC | Source for Target: final text to European Commission (Q4 2026, slipped from Q1 2026) |
| 7 Oct 2025 | Public consultation closed | Draft | Source for Public consultation closed |
| 7 Jul 2025 | Draft published for public consultation | Draft | Source for Draft published for public consultation |
| 16 Nov 2022 | Concept paper on revising Annex 11 (EMA/INS/GMP/778340/2022) | Concept | Source for Concept paper on revising Annex 11 (EMA/INS/GMP/778340/2022) |
Related
How other documents connect to this one. Links explained
- Will replace Annex 11 (2011)· Compare with Annex 11 (2011) Unverified link
- Complemented by Annex 22 · AI· Compare with Annex 22 · AI Unverified link
- Complemented by Chapter 4 revision· Compare with Chapter 4 revision Unverified link
- Risk basis from ICH Q9(R1)· Compare with ICH Q9(R1) Unverified link
- Complements Annex 15· Compare with Annex 15 Unverified link
Official source
The official text always prevails over anything on this site.
Source: European Commission. Licensed under CC BY 4.0.
Stay updated
Newsletter signup opens at launch.